Solar Plant Cost & ROI
3 MW solar power plant cost in Gujarat
A complete, independent cost, land, generation and return breakdown for a 3 MW ground-mount solar plant in Gujarat.
₹12.3 Cr
Approx. project cost
13.5
Acres of land
49.9L
Units / year
6.9–10.5 yr
Payback
Who a 3 MW plant is for
A 3 MW plant suits investors deploying ₹10+ crore and mid-sized developers building a DREBP portfolio.
Built under DREBP or open access.
3 MW at a glance
₹12.3 Cr
Total project cost
13.5 acres
Land required
49.9L
Units / year
6.9–10.5 yrs
Payback
3 MW cost & return breakdown
Sourced figures — not an EPC quote.
| Parameter | 3 MW — value (indicative) |
|---|---|
| Total project cost (CAPEX) | ₹12.3 Cr |
| Land required | 13.5 acres |
| Annual generation | 49.9 lakh units/yr |
| Annual revenue (DREBP PPA) | ₹1.38 Cr/yr |
| Annual revenue (open access) | ₹2 Cr/yr |
| Annual O&M cost | ₹0.21 Cr/yr |
| Net annual income | ₹1.17 – 1.79 Cr/yr |
| Payback period | 6.9 – 10.5 yrs |
| Year-1 AD tax benefit (40%) | ₹1.23 Cr |
| 25-year gross revenue (PPA) | ₹34.5 Cr |
Assumptions: 19% CUF, ground-mount EPC cost, Gujarat irradiance. Actual figures vary by site.
An estimate isn’t a quote.
For your 3 MW project, we tender it across our EPC network and negotiate your best real price — with the hidden costs exposed.
Frequently Asked Questions
A 3 MW ground-mount solar plant in Gujarat costs roughly ₹12.3 crore turnkey — modules, inverters, structures, civil works and grid connection. DCR-module projects cost ~₹0.8–1.0 crore/MW more.
Other plant sizes
Get an exact quote for your 3 MW plant
We tender it across our EPC network and negotiate your best price.